POOL DESIGN CONSULTANTS, INC.
5946 Millbury Court
Charlotte NC 28211
EMail: galden@pooldesignconsultants.com
Telephone
704/362-3144
Web Site at www.pooldesignconsultants.com
![]()
Facility: Pitt
County Memorial Hospital
Greenville NC
Reference:
Completion Date: Fall of 1996
Aquatic facility narrative:
General
attributes:
1.
Scope of design by Pool Design Consultants
a.
Versatile therapy pool to meet a variety of
athletic and surgical rehab and wellness requirements.
b.
Pool equipment room and chemical storage room
equipment
c.
All hydraulic components
2.
Scope of design by the architect
a.
All other aspects of the building
The
multiple use aquatic facility was designed per the following design criteria:
1.
NC Department of Environment and Natural Resources T15A: 18A .2500 NC
DENR, DEH Environmental Health Services March 1, 2004 SECTION .2500 - PUBLIC SWIMMING POOLS
2.
ANSI/NSPI 1 Current edition at the time of design
3.
ADAAG guidelines at the time of the design
The multiple use aquatic facility was designed for the
following activities:
1. Multiple
protocols as developed by the local staff
2. ADAAG access
The multiple use aquatic facility was designed for the
operational attributes:
1. Automated
sanitation systems
2. Institutional
quality hydraulic systems
3. Automated
backwash controls
4. Automated
water level control systems
5. Design
of a steam pool water heating system to use the existing campus steam system
Sincerely,
![]()