POOL DESIGN CONSULTANTS, INC.
5946 Millbury Court
Charlotte NC 28211
EMail: galden@pooldesignconsultants.com
Telephone
704/362-3144
Web Site at www.pooldesignconsultants.com
![]()
Facility: Twin
Rivers YMCA
New Bern NC
Reference: Mr. Todd Shuart CEO
At the time of construction Mr. Tom
Braaten
Completion Date: Spring of 2005
Aquatic facility narrative:
General
attributes:
1.
Scope of design by Pool Design Consultants
a.
Splash pad
b.
Multiple use pool
c.
Pool equipment room and chemical storage room
hydraulics
2.
Scope of design by the architect
a.
Deck
b.
Fence
c.
Shelter
d.
Bathhouse
e.
Pool equipment building
f.
Pneumatic cover
The
multiple use aquatic facility was designed per the following design criteria:
1.
NC Department of Environment and Natural Resources T15A: 18A .2500 NC
DENR, DEH Environmental Health Services March 1, 2004 SECTION .2500 - PUBLIC SWIMMING POOLS
2.
ANSI/NSPI 1 Current edition at the time of design
3.
YMCA Design guidelines Current edition at the time of design
The multiple use aquatic facility was designed for the
following activities:
1. Competitive
swimming events
2. Large
deck area to accommodate multiple swim team events and allow for high volume
use
3. Aerobics
4. Leisure
activities
5. Zero
depth entry
6. ADAAG
access
7. Slide
feature
8. Water
features using a splash pad
The multiple use aquatic facility was designed for the
operational attributes:
1. Automated
sanitation systems
2. Institutional
quality hydraulic systems
3. Automated
water level control systems
Sincerely,
![]()