Facility:                Twin Rivers YMCA

                             New Bern NC

 

Reference:             Mr. Todd Shuart CEO

                             At the time of construction Mr. Tom Braaten

 

Completion Date:          Spring of 2005

 

Aquatic facility narrative:

 

General attributes:

 

1.     Scope of design by Pool Design Consultants

a.     Splash pad

b.     Multiple use pool

c.      Pool equipment room and chemical storage room hydraulics

2.     Scope of design by the architect

a.     Deck

b.     Fence

c.      Shelter

d.     Bathhouse

e.      Pool equipment building

f.       Pneumatic cover

 

The multiple use aquatic facility was designed per the following design criteria:

1.     NC Department of Environment and Natural Resources T15A: 18A .2500 NC DENR, DEH Environmental Health Services March 1, 2004  SECTION .2500 - PUBLIC SWIMMING POOLS

2.     ANSI/NSPI 1 Current edition at the time of design

3.     YMCA Design guidelines Current edition at the time of design

 

          The multiple use aquatic facility was designed for the following activities:

 

1.     Competitive swimming events

2.     Large deck area to accommodate multiple swim team events and allow for high volume use

3.     Aerobics

4.     Leisure activities

5.     Zero depth entry

6.     ADAAG access

7.     Slide feature

8.     Water features using a splash pad

 

          The multiple use aquatic facility was designed for the operational attributes:

 

1.     Automated sanitation systems

2.     Institutional quality hydraulic systems

3.     Automated water level control systems

 

Sincerely,

 