POOL
EQUIPMENT
PART ONE - GENERAL
The
American Institute of Architects, General Conditions of the
Contract for Construction (AIA Document A201), 1987 edition
and Division 01000 shall govern work under this section.
1.1
SECTION INCLUDES GENERAL SCOPE OF WORK
1.2
PRODUCTS INSTALLED BUT NOT FURNISHED UNDER THIS SECTION
1.3
EQUIPMENT PURCHASED BY OWNER
1.4
RELATED OR REFERENCED SECTIONS
A.
DIVISION 1
B.
SECTIONS 131500
C.
DIVISION 15
D.
DIVISION 16
1.5
REFERENCES
1.6
SYSTEM COMPLETION
A.
PERFORMANCE REQUIREMENTS
B.
COORDINATION
C.
RELATED WORK
1.7
REGULATORY REQUIREMENTS
A.
HEALTH DEPARTMENT
B.
OTHER
1.8
SUBMITTALS
1.9
PROJECT RECORD DOCUMENTS
1.10
TESTING
1.11
INSPECTIONS
1.12
QUALITY CONTROL
1.13
EQUIPMENT SUPPLIER QUALIFICATIONS
1.14
CONTRACTOR QUALIFICATIONS
1.15
SUBCONTRACTOR QUALIFICATIONS
1.16
PROJECT/SITE CONDITIONS
1.17
ENVIRONMENTAL REQUIREMENTS
1.18
PRE-INSTALLATION CONFERENCE
1.19
DELIVERY, STORAGE AND HANDLING
1.20
WARRANTY
1.21
PROJECT CLOSEOUTS
1.22
STARTUP
1.23
TRAINING
1.24
OWNERS RESPONSIBILITY
PART 2 – PRODUCTS
2.1
GENERAL
2.2
PIPES
2.3
GENERAL
VALVES
2.4
FITTINGS
A.
STAINLESS STEEL GUTTER
B.
CONCRETE GUTTER GRATING
C.
ZERO BEACH GRATING
D.
SKIMMERS
E.
MAIN DRAIN
F.
RETURN
G.
VACUUM
H.
SENSING
I.
OVERFLOW
J.
THERAPY JET
K.
FEATURE
2.5
SURGE
TANK/BALANCE TANK/BALANCE PIPE
A.
FLOAT VALVE
B.
EXTENDED HANDLED BUTTERFLY VALVE
C.
HATCH
D.
LADDER
E.
ANTI-VORTEX PLATE
2.6
FILTER:
A.
DESCRIPTION
B.
SIZING
C.
TANK
D.
INTERNALS
E.
EXTERNALS
F.
LINKAGE
G.
SPECIAL CONTROLS
H.
PACKAGING
I.
MEDIA
J.
WARRANTY
2.7
RECIRCULATION
PUMP
A.
DESCRIPTION
B.
SIZING
C.
HAIR/LINT STRAINER
D.
GAUGES
E.
ECCENTRIC/CONCENTRICS
F.
THROTTLING VALVE
G.
CHECK VALVE
2.8
MISCELLANEOUS
EQUIPMENT
A.
FLOWMETER
B.
VACUUM LIMIT SWITCH
C.
PRESSURE MODULATING VALVE
2.9
THERAPY
JET PUMP
A.
DESCRIPTION
B.
SIZING
C.
HAIR/LINT STRAINER
D.
GAUGES
E.
ECCENTRIC/CONCENTRICS
F.
THROTTLING VALVE
G.
CHECK VALVE
2.10
THERAPY AIR BLOWER
A.
DESCRIPTION
B.
SIZING
C.
FILTER
D.
GAUGES
E.
ECCENTRIC/CONCENTRICS
F.
THROTTLING VALVE
G.
CHECK VALVE
H.
PRESSURE RELEASE VALVE
2.11
SPECIAL FEATURE PUMP
A.
DESCRIPTION
B.
SIZING
C.
HAIR/LINT STRAINER
D.
GAUGES
E.
ECCENTRIC/CONCENTRICS
F.
THROTTLING VALVE
G.
CHECK VALVE
2.12
POOL WATER HEATING SYSTEM
A.
DESCRIPTION
B.
SIZING
C.
THERMOMETER
D.
FLOWMETER
E.
PRESSURE RELEASE VALVE
F.
FLOW SWITCH
G.
PRESSURE SWITCH
2.13
SANITATION SYSTEM
A.
AUTOMATIC FEED CONTROLLER
B.
HALOGEN FEEDER
C.
pH FEEDER
D.
OZONE
E.
SALT SYSTEMS
F.
UV
2.14
AUTOMATIC MAKE-UP WATER LEVEL CONTROLLER
2.15
POOL LIGHTS
2.16
LIFEGUARD STANDS
2.17
DIVING TOWERS/PLATFORMS
2.18
DIVING STANDS
2.19
DIVING BOARDS
2.20
LADDERS
2.21
GRAB RAILS
2.22
STEP INSERTS
2.23
RAILINGS
2.24
BACKSTROKE PENNANT STANCHION
2.25
BACKSTROKE PENNANTS
2.26
RECALL STANCHION
2.27
RECALL ROPE
2.28
STARTING PLATFORM
2.29
COMPETITIVE TIMING SYSTEM
2.30
UNDERWATER OBSERVATION WINDOW
2.31
UNDERWATER SOUND SYSTEM
2.32
UNDERWATER SECURITY/ALARM SYSTEM
2.33
RACING LANE LINES
2.34
LANE LINE REEL STORAGE
2.35
WATER FEATURES
A.
SLIDE
B.
AQUATIC PLAY EQUIPMENT
2.36
SAFETY EQUIPMENT
2.37
SIGNS
2.38
MAINTENANCE EQUIPMENT
A.
AUTOMATIC CLEANERS
B.
STANDARD EQUIPMENT
PART 3 - EXECUTION
3.1
SITE
ACCESS
3.2
PIPES
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FRAMED INSTRUCTIONS
E.
PROTECTION OF COMPLETED WORK
3.3
GENERAL
VALVES
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
FRAMED INSTRUCTIONS
F.
PROTECTION OF COMPLETED WORK
3.4
FITTINGS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
FRAMED INSTRUCTIONS
G.
PROTECTION OF COMPLETED WORK
3.5
SURGE
TANK/BALANCE TANK/BALANCE PIPE
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
FRAMED INSTRUCTIONS
G.
PROTECTION OF COMPLETED WORK
3.6
FILTER:
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
FRAMED INSTRUCTIONS
G.
PROTECTION OF COMPLETED WORK
3.7
RECIRCULATION
PUMP
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
FRAMED INSTRUCTIONS
F.
PROTECTION OF COMPLETED WORK
3.8
MISCELLANEOUS
EQUIPMENT
3.9
THERAPY
JET PUMP
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
FRAMED INSTRUCTIONS
F.
PROTECTION OF COMPLETED WORK
3.10
AIR BLOWER PUMP
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
FRAMED INSTRUCTIONS
F.
PROTECTION OF COMPLETED WORK
3.11
SPECIAL FEATURE PUMP
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
FRAMED INSTRUCTIONS
F.
PROTECTION OF COMPLETED WORK
3.12
POOL WATER HEATING SYSTEM
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
FRAMED INSTRUCTIONS
G.
PROTECTION OF COMPLETED WORK
3.13
SANITATION SYSTEM
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
FRAMED INSTRUCTIONS
G.
PROTECTION OF COMPLETED WORK
3.14
AUTOMATIC MAKE-UP WATER LEVEL CONTROLLER
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
FRAMED INSTRUCTIONS
G.
PROTECTION OF COMPLETED WORK
3.15
POOL LIGHTS
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
FRAMED INSTRUCTIONS
F.
PROTECTION OF COMPLETED WORK
3.16
LIFEGUARD STANDS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.17
HANDICAP LIFT
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.18
DIVING TOWERS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.19
DIVING STANDS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.20
DIVING BOARDS
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
PROTECTION OF COMPLETED WORK
3.21
LADDERS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
PROTECTION OF COMPLETED WORK
3.22
GRAB RAILS
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
PROTECTION OF COMPLETED WORK
3.23
STEP INSERTS
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
PROTECTION OF COMPLETED WORK
3.24
RAILINGS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
PROTECTION OF COMPLETED WORK
3.25
BALLET RAILS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
PROTECTION OF COMPLETED WORK
3.26
BACKSTROKE PENNANT STANCHION
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.27
BACKSTROKE PENNANTS
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
PROTECTION OF COMPLETED WORK
3.28
RECALL STANCHION
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.29
RECALL ROPE
A.
EXAMINATION
B.
INSTALLATION
C.
ADJUSTMENT/TESTING
D.
PROTECTION OF COMPLETED WORK
3.30
STARTING PLATFORM
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.31
COMPETITIVE TIMING SYSTEM
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.32
UNDERWATER OBSERVATION WINDOW
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
PROTECTION OF COMPLETED WORK
3.33
UNDERWATER SOUND SYSTEM
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.34
UNDERWATER SECURITY/ALARM SYSTEM
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.35
RACING LANE LINES
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
PROTECTION OF COMPLETED WORK
3.36
LANE LINE STORAGE REEL
A.
EXAMINATION
B.
ASSEMBLY
C.
ADJUSTMENT/TESTING
D.
FIELD TRAINING
E.
PROTECTION OF COMPLETED WORK
3.37
VACUUM HOSE STORAGE REEL
A.
EXAMINATION
B.
ASSEMBLY
C.
ADJUSTMENT/TESTING
D.
PROTECTION OF COMPLETED WORK
3.38
WATER FEATURES
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
FIELD TRAINING
F.
FRAMED INSTRUCTIONS
G.
PROTECTION OF COMPLETED WORK
3.39
SAFETY EQUIPMENT
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
PROTECTION OF COMPLETED WORK
3.40
SIGNS
A.
EXAMINATION
B.
INSTALLATION
C.
PROTECTION OF COMPLETED WORK
3.41
MAINTENANCE EQUIPMENT
A.
EXAMINATION
B.
ASSEMBLY
C.
INSTALLATION
D.
ADJUSTMENT/TESTING
E.
PROTECTION OF COMPLETED WORK
3.42
MISCELLANEOUS
A.
DUTIES OF THE CONTRACTOR
B.
CODES, RULES, PERMITS AND FEES
C.
COOPERATION WITH OTHER TRADES
D.
RECORD DRAWINGS
E.
SURVEYS AND MEASUREMENTS
F.
SAFETY REQUIREMENTS
G.
SHOP DRAWINGS
H.
OBSERVATIONS
I.
PERMITS AND INSPECTION FEES
J.
ACCESSIBILITY
K.
CUTTING AND PATCHING
L.
UTILITIES
M.
SCAFFOLDING, RIGGING AND HOISTING
N.
EXCAVATING AND BACKFILLING
O.
PROTECTION OF WORK
P.
ADJUSTMENT
Q.
CLEANING
|