PART ONE - GENERAL
The
American Institute of Architects, General Conditions of the
Contract for Construction (AIA Document A201), 1987 edition
and Division 01000 shall govern work under this section.
1.1
SECTION INCLUDES
1.2
REFERENCED SECTIONS
1.3
SYSTEM COMPLETION
A.
GENERAL
B.
COORDINATION
C.
RELATED WORK
1.4
REGULATORY REQUIREMENTS
A.
HEALTH DEPARTMENT
B.
OTHER
1.5
SUBMITTALS
1.6
PROJECT RECORD DOCUMENTS
1.7
TESTING
1.8
QUALITY CONTROL
1.9
CONTRACTOR QUALIFICATIONS
1.10
SUBCONTRACTOR QUALIFICATIONS
1.11
PROJECT/SITE CONDITIONS
1.12
PRE-INSTALLATION CONFERENCE
1.13
DELIVERY, STORAGE AND HANDLING
1.14
WARRANTY
1.15
PROJECT CLOSEOUTS
PART 2 – PRODUCTS
2.1
SHOTCRETE/GUNITE/FORMED AND POURED
2.2
TILE
2.3
PLASTER/EPOXY/TILE POOL SURFACE COATING
2.4
COPING
2.5
DECK
2.6
DECK COATING
2.7
DECK DRAINAGE
2.8
SURGE TANK
PART 3 - EXECUTION
3.1
SITE
ACCESS
3.2
SHOTCRETE/GUNITE/FORMED
AND POURED
A.
EXAMINATION
B.
PREPARATION
C.
DESCRIPTION
D.
REINFORCING
E.
TOLERANCES
F.
CURING
G.
PROTECTION
H.
REBOUND
I.
EDGES AND CORNERS
J.
INSERTS
3.3
TILE
A.
EXAMINATION
B.
PREPARATION
C.
INSTALLATION
D.
CLEANUP
E.
PROTECTION
3.4
PLASTER/EPOXY/TILE
POOL SURFACE COATING
A.
TIMING
B.
EXAMINATION
C.
PREPARATION
D.
INSTALLATION
E.
CLEANUP
F.
PROTECTION
3.5
COPING
A.
EXAMINATION
B.
PREPARATION
C.
INSTALLATION
D.
CLEANUP
E.
PROTECTION
3.6
DECK
A.
EXAMINATION
B.
PREPARATION
C.
DESCRIPTION
D.
INSERTS
E.
BONDING
F.
INSTALLATION
G.
CLEANUP
H.
PROTECTION
3.7
DECK
COATING
A.
EXAMINATION
B.
PREPARATION
C.
INSTALLATION
D.
CLEANUP
E.
PROTECTION
3.8
DECK
DRAINAGE
A.
EXAMINATION
B.
PREPARATION
C.
INSTALLATION
D.
CLEANUP
3.9
SURGE TANK
3.10
MISCELLANEOUS
A.
DUTIES OF THE CONTRACTOR
B.
CODES, RULES, PERMITS AND FEES
C.
COOPERATION WITH OTHER TRADES
D.
RECORD DRAWINGS
E.
SURVEYS AND MEASUREMENTS
F.
SAFETY REQUIREMENTS
G.
SHOP DRAWINGS
H.
OBSERVATIONS
I.
PERMITS AND INSPECTION FEES
J.
ACCESSIBILITY
K.
CUTTING AND PATCHING
L.
UTILITIES
M.
SCAFFOLDING, RIGGING AND HOISTING
N.
EXCAVATING AND BACKFILLING
O.
PROTECTION OF WORK
P.
CLEANING
|