PART ONE - GENERAL

The American Institute of Architects, General Conditions of the Contract for Construction (AIA Document A201), 1987 edition and Division 01000 shall govern work under this section.

1.1   SECTION INCLUDES

1.2   REFERENCED SECTIONS

1.3   SYSTEM COMPLETION

A.     GENERAL

B.     COORDINATION

C.    RELATED WORK

1.4   REGULATORY REQUIREMENTS

A.     HEALTH DEPARTMENT

B.     OTHER

1.5   SUBMITTALS

1.6   PROJECT RECORD DOCUMENTS

1.7   TESTING

1.8   QUALITY CONTROL

1.9   CONTRACTOR QUALIFICATIONS

1.10         SUBCONTRACTOR QUALIFICATIONS

1.11         PROJECT/SITE CONDITIONS

1.12         PRE-INSTALLATION CONFERENCE

1.13         DELIVERY, STORAGE AND HANDLING

1.14         WARRANTY

1.15         PROJECT CLOSEOUTS


PART 2 – PRODUCTS

2.1 SHOTCRETE/GUNITE/FORMED AND POURED

2.2 TILE

2.3 PLASTER/EPOXY/TILE POOL SURFACE COATING

2.4 COPING

2.5 DECK

2.6 DECK COATING

2.7 DECK DRAINAGE

2.8 SURGE TANK  

PART 3 - EXECUTION

3.1  SITE ACCESS

3.2  SHOTCRETE/GUNITE/FORMED AND POURED

A.     EXAMINATION

B.     PREPARATION

C.    DESCRIPTION

D.    REINFORCING

E.     TOLERANCES

F.     CURING

G.    PROTECTION

H.     REBOUND

I.         EDGES AND CORNERS

J.      INSERTS

3.3  TILE

A.     EXAMINATION

B.     PREPARATION

C.    INSTALLATION

D.    CLEANUP

E.     PROTECTION

3.4  PLASTER/EPOXY/TILE POOL SURFACE COATING

A.     TIMING

B.     EXAMINATION

C.    PREPARATION

D.    INSTALLATION 

E.     CLEANUP

F.     PROTECTION

3.5  COPING

A.     EXAMINATION

B.     PREPARATION

C.    INSTALLATION

D.    CLEANUP

E.     PROTECTION

3.6  DECK

A.     EXAMINATION

B.     PREPARATION

C.    DESCRIPTION

D.    INSERTS

E.     BONDING

F.     INSTALLATION

G.    CLEANUP

H.     PROTECTION

3.7  DECK COATING

A.     EXAMINATION

B.     PREPARATION

C.    INSTALLATION

D.    CLEANUP

E.     PROTECTION

3.8  DECK DRAINAGE

A.     EXAMINATION

B.     PREPARATION

C.    INSTALLATION

D.    CLEANUP

3.9  SURGE TANK

3.10         MISCELLANEOUS

A.     DUTIES OF THE CONTRACTOR

B.     CODES, RULES, PERMITS AND FEES

C.    COOPERATION WITH OTHER TRADES

D.    RECORD DRAWINGS

E.     SURVEYS AND MEASUREMENTS

F.     SAFETY REQUIREMENTS

G.    SHOP DRAWINGS

H.     OBSERVATIONS

I.         PERMITS AND INSPECTION FEES

J.      ACCESSIBILITY

K.     CUTTING AND PATCHING

L.      UTILITIES

M.    SCAFFOLDING, RIGGING AND HOISTING

N.     EXCAVATING AND BACKFILLING

O.    PROTECTION OF WORK

P.     CLEANING  


 POOL DESIGN CONSULTANTS, INC.
Gary Wayne Alden, President
5946 Millbury Court
Charlotte, NC  28211
704.362.3144
Fax 704.362.3145

galden@pooldesignconsultants.com